| Sign In | Join Free | My infospaceinc.com |
|
Brand Name : VIC-TECH
Model Number : VSM20A-48S
Certification : RoHS, ISO9001
Place of Origin : China
MOQ : 1Unit
Price : $11~$32/Unit
Payment Terms : Western Union, T/T, L/C, MoneyGram
Supply Ability : 100000 Units/year
Delivery Time : 15-30 work days
Packaging Details : Standard export package in corrugated carton (Mass production).
Motor type : Linear stepper motor
Motor diameter : 20 mm
Step angle : 7.5°/step
Phase current : 160 mA/phase
Phase number : 2 phases (Bipolar)
Coil resistance : 74.5Ω/phase
VSM20A-48S is 20mm diameter linear stepper motor with 135mm length extra long trapezoidal lead screw. The length of lead screw is adjustable.
Besides lead screw, motor’s resistance, step angle can all be customized.
Customers can adjust all the parameters based on their own requirement.
Screw lead determines motor’s linear speed and thrust, with longer lead, motor has higher linear speed, with smaller linear pushing force/thrust.
We have two different types of step angle, including 7.5° and 15°/step.
With higher rated voltage, motor has higher coil resistance, and it depends on customer’s power supplier and driver parameters.
Typical applications:
* Medical Equipment
* Linear Robotic Control
* Precision Calibration
* High Precision Valve
* Other Precise Position Movement
Plus tt has extra low noise and high stability.


| Motor type | Linear stepper motor |
| Motor diameter | 20mm |
| Rated power | 3.4W |
| Rated voltage | 12V DC |
| Phase current | 160mA/pahse |
| Phase resistance | 74.5Ω/phase |
| Phase inductance | 36 mH/phase |
| Step angle | 7.5°/step |
| Screw lead | 0.6096mm (customizable) |
| Step length | 0.0127mm/step |
| Leads crew length | 135 mm (customizable) |
| Phase No. | 2 phases |
| Driving method | 2-2 excitation |
Chart of Thrust vs speed(PPS):

Competitive Advantage
High quality and the best price.
Fast deliver,storage company and rich inventory
Near Shanghai port, the traffic is very convenient.
Product Detail Presentation

|
|
VSM20A-48S 20mm diameter external drive long lead screw permanent magnet linear stepper motor Images |